18-11-2026

Cornerstone Laid for Elementary School in Dortmund

The cornerstone for the new Kreuz Elementary School was laid yesterday in Dortmund's Kreuzviertel neighborhood. We developed the design in collaboration with the general contractor Kleusberg.

The mayor, the school administration, and Kleusberg’s management delivered welcoming remarks. Together, they filled a time capsule. Students from the Kreuzschule had made a chain of pennants with their wishes for the new school building.

Classes in the new building are scheduled to begin in the 2027–2028 school year.

The new building is being constructed in the northern part of the schoolyard on Kreuzstraße. This will allow the school to expand from three to four classes per grade due to rising enrollment. Construction is using a modular wood-frame and prefabricated system, which saves time and conserves resources. Renewable insulation materials, wood-aluminum windows, and green roofs and facades that store water are key features of the climate-friendly design. Tree trenches supply water to the trees during dry periods.

The historic building, constructed in 1915, will be preserved and repurposed.